Recent Projects

Janet McGlinchy’s Bathroom

PROJECT TIME: 6 WEEKS FROM START TO FINISH

We had done a kitchen for her several years ago and she called us back for an update of the master bathroom. We took out the entire bathroom. We moved one wall so we could make the shower 60” wide instead of 48” wide and moved the toilet so we could gain that extra foot of space. Took out an existing built in deck mounted tub and installed a new free standing tub. New vanity, stone countertop and under mount sinks. Took out an existing soffit with recessed cans over vanity and installed new light fixtures. Installed a heated tile floor. She loves it and has gotten compliments from everyone that has seen it.

After image of kitchen AFTER
After image of kitchen AFTER
Original image of kitchen BEFORE
Original image of kitchen BEFORE