Recent Projects

Sherri Larsen’s Kitchen

PROJECT TIME: 8 WEEKS FROM START TO FINISH

Sherri and her husband Eric have a house on Bull Mountain. The kitchen had been remodeled slightly at one time with Corian style countertops, which were dated and the whole kitchen did not fit their life style. We took everything out of the kitchen. Installed all new cabinets and island. Put the island down to one level not two, which gave much more counter space.

We put in all new appliances and put all of the plugs in a strip underneath the upper cabinets so there are no plugs in the backsplash to break it up. We brought gas into the island for a new gas cook top and refinished all of the existing hardwood floors on the main level.

She is very pleased with the results of all of the projects we have done for her and her family.

After image of kitchen AFTER
After image of kitchen AFTER
Original image of kitchen BEFORE
Original image of kitchen BEFORE